close icon

Contact Us

close icon

Corporate Office
Address

29th & 30th Floors,
World Trade Center,
Brigade Gateway,
#26, Dr Rajkumar
Road, Malleshwaram,
Bengaluru, Karnataka
560055.

Dubai Branch Office

Brigade Enterprises Limited,
902, Nassima Tower
Sheikh Zayed Rd, Dubai.

Site Address

#5/142,
Rajiv Gandhi Salai,
Old Mahabalipuram Road,
Perungudi,
Chennai 600096.

Request
a callback

Please enter your first name
Please enter your last name
Please enter your email
Please enter valid email address
Please enter your country code
Please enter your phone
Please enter valid contact number
Please click the checkbox

Request
a callback

Thank you for sharing your details with us. Our team will get in touch with you shortly.

Okay

Contact Us

close icon
Please enter your first name
Please enter your last name
Please enter your email
Please enter valid email address
Please enter your country code
Please enter your phone
Please enter valid contact number
Please click the checkbox

One Time Password Verification

Verification number sent to your Mobile :
+91 7904501736

Please enter valid OTP

Didn’t receive the OTP?  RESEND

Verify OTP
sub menu

Project Status

image

WTCCR Astra – External painting work in progress - Status as of February 2023

image

WTCCR Astra – External painting and Facade work in progress - Status as of February 2023

image

WTCCR Astra – Internal and Corridor Finishes work in progress - Status as of February 2023

image

WTCCR Astra – Internal and Corridor Finishes work in progress - Status as of February 2023

image

WTCCR Zenith – 13th Floor Slab work in progress - Status as of February 2023

image

WTCCR Service Apartment – Swimming Pool works in progress - Status as of February 2023

image

WTCCR Club house – Internal & External Finishes work in progress - Status as of February 2023

image

WTCCR Podium Development work in progress - Status as of February 2023

image

WTCCR External Development works in progress - Status as of February 2023

image

WTCCR External Development works in progress - Status as of February 2023

image

WTCCR External Development works in progress - Status as of February 2023

image

WTCCR Astra (A1) – Milestone Release On Commencement of fixing of Doors and Windows - 21st and above Floors - Status as of February 2023

image

WTCCR Astra (A1) – Milestone Release On Commencement of fixing of Doors and Windows - 21st and above Floors - Status as of February 2023

image

WTCCR Astra (A1) – Milestone Release On Commencement of fixing of Doors and Windows - 21st and above Floors - Status as of February 2023

image

Astra - External painting work in progress - Status as of January 2023

image

Astra - External facade work in progress - Status as of January 2023

image

Astra - Internal and corridor finishes work in progress - Status as of January 2023

image

Astra - Internal and corridor finishes work in progress - Status as of January 2023

image

Zenith - 11th floor slab work in progress - Status as of January 2023

image

Clubhouse - Parapet Wall work in progress - Status as of January 2023

image

Service Apartment - 12th floor (Service Floor) slab completed - Status as of January 2023

image

External Development and Podium Development work in progress - Status as of January 2023

image

External Development and Podium Development work in progress - Status as of January 2023

image

External Development and Podium Development work in progress - Status as of January 2023

image

WTCCR Tower A2(Zenith) - Milestone Release – On Casting of 10th Floor Slab - Status as of January 2023

image

WTCCR Tower A2(Zenith) - Milestone Release – On Casting of 10th Floor Slab - Status as of January 2023

image

WTCCR Tower A2(Zenith) - Milestone Release – On Casting of 10th Floor Slab - Status as of January 2023

image

WTCCR Tower A2(Zenith) - Milestone Release – On Casting of 10th Floor Slab - Status as of January 2023

image

WTCCR Zenith Tower A2 - Milestone Release – Commencement of flooring - 1st to 5th Floor - Status as of January 2023

image

WTCCR Zenith Tower A2 - Milestone Release – Commencement of flooring - 1st to 5th Floor - Status as of January 2023

image

WTCCR Zenith Tower A2 - Milestone Release – Commencement of flooring - 1st to 5th Floor - Status as of January 2023

image

WTCCR Zenith Tower A2 - Milestone Release – Commencement of flooring - 1st to 5th Floor - Status as of January 2023

image

WTCCR Astra Tower A1 - Milestone Release Commencement of fixing of Doors and Windows - 16th to 20th Floors - Status as of January 2023

image

WTCCR Astra Tower A1 - Milestone Release Commencement of fixing of Doors and Windows - 16th to 20th Floors - Status as of January 2023

image

WTCCR Astra Tower A1 - Milestone Release Commencement of fixing of Doors and Windows - 16th to 20th Floors - Status as of January 2023

image

Astra – External Painting & Façade Works in Progress - Status as of December 2022

image

Astra – Internal Finishes And MEP Work In Progress - Status as of December 2022

image

Astra – Internal Finishes And MEP Work In Progress - Status as of December 2022

image

Astra – Internal Finishes And MEP Work In Progress - Status as of December 2022

image

Zeinth – 7th Floor Slab Completed & 8th, 9th Floor in Progress - Status as of December 2022

image

Club House – Parabolic Roof Work Completed - Status as of December 2022

image

Service Apartment – 11th Floor Completed & Service Floor Work In Progress - Status as of December 2022

image

Basement – MEP works - Status as of December 2022

image

Pump Room – Fire Pumps - Status as of December 2022

image

External Development – West Side Work in progress - Status as of December 2022

image

Podium Development – Waterproofing works in progress - Status as of December 2022

image

Astra - External Painting Works in Progress - Status as of November 2022

image

Astra - Internal Finishes And MEP Work In Progress - Status as of November 2022

image

Astra - Internal Finishes And MEP Work In Progress - Status as of November 2022

image

Astra - Internal Finishes And MEP Work In Progress - Status as of November 2022

image

Zeinth – 6th Floor Slab Completed & 7th Floor In Progress - Status as of November 2022

image

Club House – Parabolic Roof Work In Progress - Status as of November 2022

image

Service Apartment – 11th Floor Work In Progress - Status as of November 2022

image

Basement – MEP works - Status as of November 2022

image

WTCCR TowerA1(Astra) – Milestone Release Commencement of Installation of Lifts - Status as of November 2022

image

WTCCR TowerA1(Astra) – Milestone Release Commencement of Installation of Lifts - Status as of November 2022

image

WTCCR TowerA1(Astra) – Milestone Release Commencement of Installation of Lifts - Status as of November 2022

image

WTCCR Zenith(A2) - Milestone Release On Casting of Fifth Floor Slab - Status as of November 2022

image

WTCCR Zenith(A2) - Milestone Release On Casting of Fifth Floor Slab - Status as of November 2022

image

WTCCR Astra(A1) - Milestone Release Commencement of fixing of Doors and Windows 11th to 15th Floors - Status as of November 2022

image

WTCCR Astra(A1) - Milestone Release Commencement of fixing of Doors and Windows 11th to 15th Floors - Status as of November 2022

image

WTCCR Astra(A1) - Milestone Release Commencement of fixing of Doors and Windows 11th to 15th Floors - Status as of November 2022

image

WTCCR Astra(A1) - Milestone Release Commencement of fixing of Doors and Windows 11th to 15th Floors - Status as of November 2022

image

Astra – External Painting Works in Progress - Status as of October 2022

image

Astra Finishes – Fixing of Doors, Windows, Sliding Doors - Status as of October 2022

image

Astra Finishes – Fixing of Doors, Windows, Sliding Doors - Status as of October 2022

image

Astra Finishes – Fixing of Doors, Windows, Sliding Doors - Status as of October 2022

image

Astra – MEP Works In Progress - Status as of October 2022

image

Astra – MEP Works In Progress - Status as of October 2022

image

Zenith – 4th & 5th Floor Slab in progress - Status as of October 2022

image

Zenith – 4th & 5th Floor Slab in progress - Status as of October 2022

image

Club House – Parabolic roof works in progress - Status as of October 2022

image

Club House – Parabolic roof works in progress - Status as of October 2022

image

Club House – Parabolic roof works in progress - Status as of October 2022

image

Serviced Apartment – 9th Floor Level Slab Completed - Status as of October 2022

image

Serviced Apartment – 9th Floor Level Slab Completed - Status as of October 2022

image

Basement – MEP Works - Status as of October 2022

image

External Development - North & West Side Work In Progress - Status as of October 2022

image

External Development - North & West Side Work In Progress - Status as of October 2022

image

Astra – External Painting Works in Progress - Status as of September 2022

image

Astra Finishes – Fixing of Doors, Windows, Sliding Doors - Status as of September 2022

image

Astra Finishes – Fixing of Doors, Windows, Sliding Doors - Status as of September 2022

image

Astra - MEP Works In Progress - Status as of September 2022

image

Astra - MEP Works In Progress - Status as of September 2022

image

Zenith – 4th Floor Slab in progress - Status as of September 2022

image

Zenith – 4th Floor Slab in progress - Status as of September 2022

image

Clubhouse – Parabolic roof works in progress - Status as of September 2022

image

Serviced Apartment – 8th Floor Level Slab Completed - Status as of September 2022

image

Serviced Apartment – 8th Floor Level Slab Completed - Status as of September 2022

image

Basement – MEP Works - Status as of September 2022

image

WTCCR Astra(A1) – Milestone Release – Commencement of Flooring 21st floor & above - Status as of September 2022

image

WTCCR Astra(A1) – Milestone Release – Commencement of Flooring 21st floor & above - Status as of September 2022

image

WTCCR Tower(A1) Astra - Milestone Release – Commencement of fixing of Doors and Windows 6th to 10th Floors - Status as of September 2022

image

WTCCR Tower(A1) Astra - Milestone Release – Commencement of fixing of Doors and Windows 6th to 10th Floors - Status as of September 2022

image

Astra - Terrace Floor slab completed and above terrace work is in progress - Status as of August 2022

image

Astra - Terrace Floor slab completed and above terrace work is in progress - Status as of August 2022

image

Zenith - Third floor slab work is in progress - Status as of August 2022

image

Serviced Apartment – Seventh floor slab completed & Column above 7th Floor is progress - Status as of August 2022

image

Club House - Terrace Floor slab work is in progress - Status as of August 2022

image

Club House - Terrace Floor slab work is in progress - Status as of August 2022

image

Astra – Finishes work is in progress - Status as of August 2022

image

Astra – Finishes work is in progress - Status as of August 2022

image

Astra – MEP work is in progress - Status as of August 2022

image

Basement works is in progress - Status as of August 2022

image

Basement works is in progress - Status as of August 2022

image

Astra – Above terrace work is in progress - Status as of July 2022

image

Club House – Terrace Floor slab completed and Parabolic roof work is in progress - Status as of July 2022

image

Zenith – 2nd Floor Slab in progress - Status as of July 2022

image

Serviced Apartment – 5th floor column completed & 6th Floor Slab works is in progress - Status as of July 2022

image

Astra Finishes – 23rd Floor Painting work is in progress - Status as of July 2022

image

Astra Finishes – Tile dado and Marble Flooring 17th Floor is in progress - Status as of July 2022

image

Astra Finishes – Aluminum Windows & Sliding door 1st to 5th Floor is in progress - Status as of July 2022

image

Astra Finishes – Corridor Flooring 4th Floor & False Ceiling 5th Floor is in progress - Status as of July 2022

image

Astra – External façade Painting works is in progress - Status as of July 2022

image

Astra – MEP work is in progress - Status as of July 2022

image

Basement works is in progress - Status as of July 2022

image

WTCCR Tower(A1) Astra - Milestone Release - Commencement of Flooring - 16 to 20 floors - Status as of July 2022

image

WTCCR Tower(A1) Astra - Milestone Release - Commencement of Flooring - 16 to 20 floors - Status as of July 2022

image

WTCCR Tower(A1) Astra - Milestone Release - Commencement of Flooring - 16 to 20 floors - Status as of July 2022

image

WTCCR Tower(A1) Astra – Milestone Release Commencement of fixing of Doors and Windows - Status as of July 2022

image

WTCCR Tower(A1) Astra – Milestone Release Commencement of fixing of Doors and Windows - Status as of July 2022

image

WTCCR Tower(A1) Astra – Milestone Release Commencement of fixing of Doors and Windows - Status as of July 2022

image

WTCCR Tower(A1) Astra - Release of Milestone – Commencement of painting - Status as of July 2022

image

WTCCR Tower(A1) Astra - Release of Milestone – Commencement of painting - Status as of July 2022

image

Astra - Terrace Floor slab completed and above terrace work is in progress - Status as of June 2022

image

Club House - Terrace Floor slab work is in progress - Status as of June 2022

image

Zenith - First floor slab work is in progress column above 1st Floor - Status as of June 2022

image

Serviced Apartment - Fifth floor slab completed & Column above 5th Floor is progress - Status as of June 2022

image

Astra - Finishes work is in progress - Status as of June 2022

image

Astra - Finishes work is in progress - Status as of June 2022

image

Astra – MEP work is in progress - Status as of June 2022

image

Astra – MEP work is in progress - Status as of June 2022

image

Basement works is in progress - Status as of June 2022

image

Basement works is in progress - Status as of June 2022

image

Basement works is in progress - Status as of June 2022

image

WTCCR Upper Terrace - Status as of June 2022

image

WTCCR Upper Terrace - Status as of June 2022

image

WTCCR Tower(A1) Astra - Release of Milestone – Commencement of Flooring-11 to 15 floors - Status as of May 2022

image

WTCCR Tower(A1) Astra - Release of Milestone – Commencement of Flooring-11 to 15 floors - Status as of May 2022

image

Astra - 25th floor level slab work is in progress - Status as of April 2022

image

Zenith - First floor slab work is in progress - Status as of April 2022

image

Club House - Third Floor slab work is in progress - Status as of April 2022

image

Serviced Apartment - Fifth floor slab is in progress - Status as of April 2022

image

Astra - Finishes work is in progress - Status as of April 2022

image

Astra - Finishes work is in progress - Status as of April 2022

image

Astra - MEP work is in progress - Status as of April 2022

image

Astra - MEP work is in progress - Status as of April 2022

image

Astra A1 - Painting work has been commenced at 16th floor level of Tower – Status as of April 2022

image

Astra A1 - Painting work has been commenced at 16th floor level of Tower – Status as of April 2022

image

Astra A1 - Painting work has been commenced at 16th floor level of Tower – Status as of April 2022

image

Astra A1 - Painting work has been commenced at 16th floor level of Tower – Status as of April 2022

image

Astra – 23rd floor level slab work is in progress - Status as of March 2022

image

Zenith – First floor slab work is in progress - Status as of March 2022

image

Club House – Third Floor slab work is in progress - Status as of March 2022

image

Serviced Apartment – Column above Fourth floor slab is in progress - Status as of March 2022

image

Non Tower Area – Podium slab completed - Status as of March 2022

image

Astra – Finishes work is in progress - Status as of March 2022

image

Astra – Finishes work is in progress - Status as of March 2022

image

Astra – MEP work is in progress - Status as of March 2022

image

Astra – MEP work is in progress - Status as of March 2022

image

Astra – 22nd floor level slab work is in progress - Status as of February 2022

image

Zenith – First floor slab work is in progress - Status as of February 2022

image

Club House – Column above First floor slab work is in progress - Status as of February 2022

image

Serviced Apartment – Fourth floor slab is in progress - Status as of February 2022

image

Astra – Finishes work is in progress - Status as of February 2022

image

Astra – Finishes work is in progress - Status as of February 2022

image

Astra – MEP work is in progress - Status as of February 2022

image

Astra – MEP work is in progress - Status as of February 2022

image

Astra – 20th floor level slab work is in progress - Status as of January 2022

image

Zenith – First floor slab work is in progress - Status as of January 2022

image

Club House – First floor slab work is in progress - Status as of January 2022

image

Serviced Apartment – Column above Third floor slab is in progress - Status as of January 2022

image

Astra – Finishes work is in progress - Status as of January 2022

image

Astra – Finishes work is in progress - Status as of January 2022

image

Astra – MEP work is in progress - Status as of January 2022

image

Astra – MEP work is in progress - Status as of January 2022

image

Astra – Column above 18th floor level slab work is in progress - Status as of December 2021

image

Zenith – First floor slab work is in progress - Status as of December 2021

image

Club House – First floor slab work is in progress - Status as of December 2021

image

Serviced Apartment – Third floor slab is in progress - Status as of December 2021

image

Astra – Finishes work is in progress - Status as of December 2021

image

Astra – Finishes work is in progress - Status as of December 2021

image

Astra – MEP work is in progress - Status as of December 2021

image

Astra – MEP work is in progress - Status as of December 2021

image

Astra – Column above 16th floor level slab work is in progress – Status as of November 2021

image

Astra – Painting and Toilet work is in progress – Status as of November 2021

image

Zenith – Ground floor slab work is in progress – Status as of November 2021

image

Club House – Ground floor slab work is in progress – Status as of November 2021

image

Serviced Apartment – Second floor slab is in progress – Status as of November 2021

image

Astra – Column above 15th floor level slab work is in progress – Status as of October 2021

image

Astra – Painting and Toilet work is in progress – Status as of October 2021

image

Zenith – Ground floor work is in progress – Status as of October 2021

image

Club House – Basement 1 slab work is in progress – Status as of October 2021

image

Serviced Apartment – Second floor slab is in progress – Status as of October 2021

image

Overall view – Status as of August 2021

image

Tower A1 – Column above eleventh floor level above slab work is in progress – Status as of August 2021

image

Tower A2 – Basement 1 and Ground floor work is in progress – Status as of August 2021

image

Tower A4 – Raft work is in progress – Status as of August 2021

image

Non Tower – Ground floor and Podium work is in progress – Status as of August 2021

image

OVERALL VIEW – Status as of July 2021

image

Tower A1 – Ninth floor level above slab work is in progress – Status as of July 2021

image

Tower A2 –Basement 1 and Ground floor work is in progress – Status as of July 2021

image

Tower A4 – Excavation and raft work is in progress – Status as of July 2021

image

Non Tower – Ground floor and Podium work is in progress – Status as of July 2021

image

Overall view - Status as of June 2021

image

Tower A1: Seventh floor level above wall work-in-progress - Status as of June 2021

image

Tower A2: Basement 1 and Raft work-in-progress - Status as of June 2021

image

Tower A3: Column above ground floor work-in-progress - Status as of June 2021

image

Tower A4: Excavation and raft work-in-progress - Status as of June 2021

image

Non Tower: Basement 1 and column above raft work-in-progress - Status as of June 2021

image

Overall view - Status as of May 2021

image

Tower A1: Fifth floor level above wall work-in-progress - Status as of May 2021

image

Tower A2: Basement 1 and Raft work-in-progress - Status as of May 2021

image

Tower A3: Column above ground floor work-in-progress - Status as of May 2021

image

Tower A4: Excavation and raft work-in-progress - Status as of May 2021

image

Non Tower: Basement 1 and column above raft work-in-progress - Status as of May 2021

image

Overall view - Status as of April 2021

image

Tower A1: Fourth floor level above wall work-in-progress - Status as of April 2021

image

Tower A2: Basement 1 and Raft work-in-progress - Status as of April 2021

image

Tower A3: Column above ground floor work-in-progress - Status as of April 2021

image

Tower A4: Excavation and raft work-in-progress - Status as of April 2021

image

Non Tower: Basement 1 and column above raft work-in-progress - Status as of April 2021

image

Overall progress - Status as of March 2021

image

Tower A1: Third floor level slab work-in-progress - Status as of March 2021

image

Tower A2: PCC and Raft work-in-progress - Status as of March 2021

image

Non Tower: Basement 1 level slab work-in-progress - Status as of March 2021

image

Non Tower: Earthwork excavation is in progress - Status as of March 2021

image

Overall View - Status as of February 2021

image

OverTower A1: Third floor level slab work-in-progress - Status as of February 2021

image

Tower A1: Second floor above wall reinforcement and shuttering work-in-progress - Status as of February 2021

image

Non Tower: Basement and ground floor level slab work-in-progress - Status as of February 2021

image

Tower A2: Raft work-in-progress - Status as of February 2021

image

Tower A3: Column & retaining wall above basement-1 work-in-progress - Status as of February 2021

image

Overall View - Status as of January 2021

image

Tower A1: Second floor level slab reinforcement work-in-progress - Status as of January 2021

image

Tower A1: First floor above wall reinforcement work-in-progress - Status as of January 2021

image

Non Tower: Podium and Ground floor level slab work-in-progress - Status as of January 2021

image

Non Tower: Raft reinforcement is in progress - Status as of January 2021

image

Tower A3: Basement level 1 slab is in progress - Status as of January 2021

image

Tower A1: Overall view - Status as of December 2020

image

Tower A1: First floor level slab reinforcement work-in-progress - Status as of December 2020

image

Tower A1: First floor level slab shuttering work-in-progress - Status as of December 2020

image

Tower A1: First floor level slab work-in-progress - Status as of December 2020

image

Non tower area: Podium level slab shuttering in progress - Status as of December 2020

image

Tower A1: GF to FF level column in progress - Status as of November 2020

image

Non-tower area: B1 slab 26% completed - Status as of November 2020

image

Non-tower area: GF slab 21% completed - Status as of November 2020

image

Tower and Non-tower area - Status as of November 2020

image

Towers A1 and B1: Slab level completed - Status as of October 2020

image

Tower A1: GF slab in progress - Status as of October 2020

image

Towers A1 and B1 to GF column 50% completed - Status as of October 2020

image

Non-tower area: 35% raft completed - Status as of October 2020

image

Non-tower area: B1 slab 35% completed - Status as of October 2020

image

Tower A1—Raft completed; Tower B1—slab 60% completed - Status as of September 2020

image

Non-tower Area: 30% raft completed - Status as of September 2020

image

Tower A1—raft completed; Tower B1—slab formwork under progress - Status as of August 2020

image

Tower A1—Raft Completed; Tower B1—slab formwork under progress - Status as of August 2020

image

Non-tower area: Pour 1—raft completed and columns in progress; Pour 2—raft work-in-progress; A2 excavation completed. - Status as of August 2020

image

Tower A1 PCC 100% completed, raft waterproofing 100% completed, 75% raft concreting completed and balance in progress - Status as of July 2020

image

Tower A2 Excavation status - Status as of July 2020

image

Tower A3 and part podium excavation completed - Status as of July 2020

image

Excavation work-in-progress (60,000 Cum completed till now) - Status as of July 2020

image

Tower A1: PCC 100% completed, raft waterproofing 85% completed, reinforcement work-in-progress - Status as of June 2020

image

Tower A2: Excavation under progress - Status as of June 2020

image

Tower A3 and part podium excavation completed. Tower crane foundation completed - Status as of June 2020

image

Excavation work-in-progress (55,000 Cum completed till now) - Status as of June 2020

image

Tower A1: Excavation work completed - Status as of May 2020

image

Tower A1: PCC works under progress—40% completed - Status as of May 2020

image

Tower A1: Excavation work completed - Status as of May 2020

image

Towers A2 and A3: Excavation work nearing completion - Status as of May 2020

image

Excavation work completed for Tower Astra - Status as of March 2020

image

PCC work under progress for Tower Astra-30% completed - Status as of March 2020

image

Excavation work under progress for Tower Zenith & Tower A3 - Status as of March 2020

image

Excavation work in progress Clubhouse Tower(40,800 completed till now)- Status as of March 2020